الصفحة الرئيسية> مدونة> Tips for maintenance of Samller Wheel Loaders

Tips for maintenance of Samller Wheel Loaders

September 16, 2021
In order to maintain the normal operation of the small wheel loaders,smaller excavators ,Road Rollers,
and prolong its service life, it is necessary to carry out systematic, meticulous inspection, adjustment and cleaning of the various parts of the loader to create good working conditions for the normal operation of the loader and prevent the loader. Various failures caused by early wear and tear can give full play to the performance of the loader, so all maintenance work must be done carefully before and during the use of the loader.

       The running-in and maintenance of the vehicle must first be carried out according to the requirements in the loader manual. The running-in phase of the new car takes about 60 hours. During the running-in phase, the following points must be done:
       1. Read the manual of the loader carefully and pay attention to every precaution in the manual;
       2. During the running-in period, forward gears and backward gears, each gear should be evenly arranged for running-in. The load weight during the running-in period shall not exceed 70% of the rated load;

       3. Pay attention to the lubrication of the machine, replace or add lubricating oil according to the specified time;

2tons Smaller Loader 3 Jpg2tons Smaller Loader 1 Jpg

4. Always pay attention to the temperature of the wheel loader spare parts ,Engine Radiator,Hydraulic Oil Filter
gearbox, torque converter, front and rear axles, wheels and brake drums. If there is overheating, find out the cause and eliminate it;

       5. During the walk-in period, it is advisable to load loose materials, and do not proceed too violently or rushingly;

2tons Wheel Loader 1 Jpg

       6. Check the temperature and connection of each component of the electrical system, power supply status of the generator, lighting and other working conditions;
       7. Check all the key components of the loader (engine,Hydraulic Main Pump,Komatsu Travel Motor,Excavator Travel Motor

 

, axle box transformer, rim, drive shaft, etc.) bolts and nuts tightening;

       8. After the running-in period expires, clean the gearbox oil pan filter and replace it with new oil; and change the engine oil and transaxle oil.
اتصل بنا

Author:

Ms. Janice

بريد إلكتروني:

info@oceanmach.com

Phone/WhatsApp:

+8615668197710

المنتجات الشعبية
You may also like
Related Categories

البريد الإلكتروني لهذا المورد

الموضوع:
الالكتروني:
رسالة:

Your message must be betwwen 20-8000 characters

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

إرسال